Monday, June 23, 2008

More Plaster

The hanging of the plaster sheets is nearly finished. From what I can tell there are just a few spots in the ceiling to be finished.

This picture is looking towards our kitchen, you can see the fridge space and the walk in pantry next to it. This area has an extra raised ceiling.
This is the family room with the rumpus room in the distance.
A close up of the rumpus room.
They have also plastered the inside of the garage

Thursday, June 19, 2008

Plastering has started

Well we are now on day two of plastering finally! I have not posted for ages because plastering had been put off by an entire month to enable PD to fix the problems Kevin found at the pre-plaster inspection. From what I can tell it took a maximum of two days to actually fix the problems so the rest of the month was just messing around. Our site supervisor "A" obviously could not cope with the issues so he was taken off our job and we now have site supervisor "C". We are glad to be rid of "A" as he never called us once to let us know where we were up to.

In my last post on 28th May I emailed our CSR about the claimed rain days that it was not raining on and she was going to get back to me. Still no response, what a surprise! I have even emailed a reminder about it and since then forwarded the same email again. Maybe like our last CSR she has left the company and no-one has told us again???

Anyway it is great to see the plaster finally started apparently they will finish tomorrow or Monday and then a different crew come to do the skirtings etc.

This is the rumpus room half done.

This is our ensuite
This is the dining room, looking into the lounge room.

This is the most recent picture of the front of the house. It looks a lot neater now the bricks are clean.