Well we are now on day two of plastering finally! I have not posted for ages because plastering had been put off by an entire month to enable PD to fix the problems Kevin found at the
pre-plaster inspection. From what I can tell it took a maximum of two days to actually fix the problems so the rest of the month was just messing around. Our site supervisor "A" obviously could not cope with the issues so he was taken off our job and we now have site supervisor "C". We are glad to be rid of "A" as he never called us once to let us know where we were up to.
In my last post on 28
th May I emailed our
CSR about the claimed rain days that it was not raining on and she was going to get back to me. Still no response, what a surprise! I have even emailed a reminder about it and since then forwarded the same email again. Maybe like our last
CSR she has left the company and no-one has told us again???
Anyway it is great to see the plaster finally started apparently they will finish tomorrow or Monday and then a different crew come to do the
skirtings etc.
This is the rumpus room half done.

This is our
ensuite
This is the dining room, looking into the lounge room.

This is the most recent picture of the front of the house. It looks a lot neater now the bricks are clean.